Operational clearance or preload versus main operational criteria

  1. 1) A ratio of 1 means that all rolling elements are loaded.
  2. 2) The dotted line indicates potentially unstable working conditions.
  3. 3) Limits of range are determined by initial clearance, fit and temperature effects.

Contact us